Before you buy land around Hyderabad, check its zone in the HMDA master plan. The zone decides what can be built there. A plot sold as “residential” can sit in an agricultural, water-body or peri-urban zone where building is restricted.

The main zones in HMDA Master Plan 2031

Residential R1–R3Residential development allowed. R1 is next to growth corridors (higher density), R2 other urban areas, R3 urban centres
R4 (village settlements)Gramakantham: natural expansion of villages only, not plotted layouts
CommercialShops, offices, mixed use
ManufacturingIndustry and work centres, not housing
Peri-urbanTransition areas. Limited coverage (about 25% of the land) and height limits (about 18 m residential, 15 m commercial)
Agricultural / conservationFarming. No layouts without a change of land use
Water bodiesLakes, tanks, kuntas, nalas. No construction inside the full tank level (FTL), plus a buffer of 30 m or 9 m depending on the water body
Forest, recreation, public useNot for private housing

How to check a plot’s zone

  1. Get the survey number, village and mandal from the sale deed or pahani.
  2. Check the land use on the master plan maps published by HMDA ↗, or ask HMDA in writing for the land use of that survey number.
  3. Compare it with the developer’s approved layout plan and LP number. They should agree.
  4. Check the distance from any lake or nala, and the FTL and buffer, before you pay.
  5. Near the airport, also check the height limit: buildings need an Airports Authority of India NOC (NOCAS portal) and the old HADA zoning still applies in parts.

Changing a zone (a change of land use) is decided by HMDA and takes time and fees. Never buy on a promise that a zone “will be changed”.

What has changed recently

  • May 2023: the State Cabinet scrapped GO 111, which had restricted building in 84 villages in the catchment of Osman Sagar and Himayat Sagar (Shamshabad, Rajendranagar, Moinabad, Chevella and Shabad mandals).
  • March 2025: HMDA’s area was expanded to about 10,472 sq km (G.O.Ms.No.68), covering the Regional Ring Road belt. 36 villages moved to the new Future City Development Authority.
  • Master Plan 2050: under preparation, with mobility, economic and blue-green sub-plans reported complete in April 2025. It will split the region into three parts: up to the ORR, ORR to RRR, and beyond the RRR. Until it is notified, the existing master plans apply.

Related: Regional Ring Road status · Bharat Future City · property calculators.

Sources

  • 1acre, “Hyderabad HMDA masterplan: zone check and land use guide”, verified April 2026.
  • Telangana Today, “Telangana Cabinet scraps GO 111; 84 villages get free from restrictions in land use”, 19 May 2023.
  • Deccan Chronicle, “HMDA grows to 10,472 sq km, plans new Master Plan 2050”, 10 March 2025.
  • Munsif Daily, “Telangana govt to launch HMDA Master Plan 2050 after finalizing key sub-plans”, 15 April 2025.
  • 1acre, “Hyderabad air funnel zones”, 2026.
Found this useful? Share it with someone who is buyingShare on WhatsApp
Before you commit

Verify RERA and ground facts before you sign.

Share the project or area you’re considering. I’ll check the approvals, the RERA record and what is actually on the ground, and tell you plainly what I find. The first call is free.